Location: Portland, Oregon
Client: Confidential Distribution Company
Contract Value: $127,040

AEC was contracted to replace a waste water system catch basin and an oil water separator at a distribution site in Portland. To perform the work, AEC used shoring techniques to tilt a concrete building and remove and replace an existing waste water catch basin and pump system. Our work also included the excavation and removal of an existing underground concrete waste oil sump as well as the supply and installation of an above ground steel waste oil containment system.

Middle Fork Bridge Project
Underground Storage Tank Replacement